Power factor (PF) is the ratio of real power (kW) to apparent power (kVA). Inductive loads such as motors and transformers pull PF below 1, so the system has to carry extra current that does no useful work. Power factor correction adds capacitance or active compensation to cancel that reactive demand. It frees up capacity, lowers losses and can avoid utility penalties.

Last reviewed · Published by Essential Systems

Line of switchgear cabinets with an open section showing copper busbars

kW, kVAR and kVA

Real power (kW) does work. Reactive power (kVAR) sustains the magnetic fields motors need. Apparent power (kVA) is their vector sum: kVA = √(kW² + kVAR²), and PF = kW ÷ kVA. At 0.75 PF, the same 75 kW load demands 100 kVA. Correcting to 0.95 lowers that to about 79 kVA.

Why low power factor matters

  • Utility charges: many commercial tariffs bill on kVA demand or add penalties below a PF threshold, often 0.90 or 0.95. Check your own rate schedule.
  • Lost capacity: transformers, generators and feeders are rated in kVA. Reactive current uses up that rating.
  • Higher losses and voltage drop: extra current heats conductors (I²R) and depresses voltage at the far end of feeders.

Correction methods

Fixed capacitors at the motor

Capacitors connected at individual large motors that run continuously. They are simple, but must be sized carefully: oversizing can cause self-excitation when the motor is disconnected.

Automatic capacitor banks

A controller switches capacitor steps in and out at the service or a main distribution board as load changes. This is the most common approach for whole-facility correction.

Detuned banks and active filters

Where VFDs and other non-linear loads create harmonics, plain capacitors can resonate and fail. Detuned (reactor-equipped) banks or active harmonic filters correct PF while managing harmonics. See Common Three-Phase Problems.

Sizing a correction project

Required kVAR ≈ kW × (tan θ₁ − tan θ₂), where θ₁ and θ₂ are the angles for the existing and target PF. A proper study uses interval metering data, utility bills and a harmonic survey before equipment is specified.